Reduce LTSA maintenance costs by up to 35% and significantly mitigate risk for gas turbine owners.
Provided construction management and QA/QC inspectors on utility scale solar, wind and battery storage projects(100MW or higher), contributing to renewable energy growth

Solutions
Define future target state: Establishmaintenance philosophy with operations team versus current LTSA.
Vendor Selection: RFP preparation, evaluation and selection
Contractual Negotiations: Lead contractual negotiations, draft ownership, utilizing IEMs proven contractual framework.
Outcome
150+ negotiated LTSA contracts
35%: lower maintenance cost
23m cost savings
200+ turbines
GE
GE: 7FA, 7EA, 9FA, 6F.03
LM-2500, 2500+ 6000, D11
Siemens
8000H, 501F, 501FC
V94, V84.3A2
MHI
501F, 501G, 501GAC
701F
Alstom
GT24