Bridged Critical Resource Gaps to Advance Substation Design

PROJECT BACKGROUND

A major utility lacked internal bandwidth and specialized expertise to manage and review a substation design project.

image18.jpeg
CEIS_0600_POWER_TRANS_PNG.png
CHALLENGES ADDRESSED

INFRASTRUCTURE IMPACT

  • Improved safety and access at GRE’s interconnected substation

  • Optimized 230kV capacitor bank placement for long-term maintenance

  • Supported sound abatement planning and infrastructure resilience

  • Elevated design quality through expert review of drawings and vendor proposals

STRATEGIC CONTRIBUTIONS

  • Led early-stage project development and vendor coordination

  • Provided engineering authority for as-built approvals, ensuring compliance

VALUE DELIVERED

  • Enabled project advancement without increasing internal headcount

  • Delivered specialized expertise in grounding, stroke protection, and equipment evaluation

  • Accelerated decision-making through cross-functional collaboration